Waste classification and the duty of care
Decommissioning can produce waste streams that were not routinely generated while the site was operating. These may include tank sludges, chemical residues, contaminated washings, insulation, demolition materials and contaminated soil. Each stream needs to be identified and classified according to its composition and the process or activity from which it arose.
Waste must be classified before it is collected, disposed of or recovered. Its description needs the appropriate waste code and hazardous status, with the relevant information recorded on the waste transfer or consignment documentation. Hazardous waste must not be mixed with non-hazardous waste or with other hazardous waste where prohibited. Separating materials at source also makes the subsequent classification and disposal arrangements easier to establish.
The waste producer or holder must make appropriate checks on the carrier and receiving facility and retain the required documentation. For hazardous waste in England, this includes the relevant consignment notes and consignee returns, with records retained for three years at the premises where the waste was produced or stored. The GOV.UK hazardous waste guidance sets out these responsibilities. Waste documentation and procedural requirements differ across the UK, so the rules of the relevant jurisdiction must be applied.
Waste records are also part of the site handover evidence. They help demonstrate which materials were removed, how they were classified and where they were taken. This is particularly useful when a former industrial site is being investigated for redevelopment or when the environmental permit position is being reviewed.
Surrendering an environmental permit
Where a site holds an environmental permit, the permit position needs to be addressed as part of closure. Cancelling all or part of a permit is known as surrender or partial surrender. Permit charges can continue until surrender has been completed.
In England, installations, intensive farming, waste and mining waste permits are surrendered through an application process that includes the surrender section of the site condition report. Standalone water discharge, groundwater and flood risk activity permits can be surrendered by notification. The Environment Agency guidance on changing, transferring or cancelling an environmental permit explains the applicable procedures. Scotland, Wales and Northern Ireland have their own regulators and permitting arrangements.
For an installation permit, the site condition report provides a record of relevant land and groundwater conditions and supports the assessment of the site’s condition at surrender. Information gathered during decommissioning, including records of releases, waste removal, investigations and any remedial work, may be needed to support the submission.
The permit review should therefore take place alongside the physical shutdown rather than being left until the site has been cleared. The related environmental permit applications service page covers the wider permitting process.
Land quality and verification
Once access is available, the ground can be assessed against the site history and the proposed future use. Land contamination risk management follows three stages: risk assessment, options appraisal, then remediation and verification. The Environment Agency, Northern Ireland Environment Agency, Scottish Environment Protection Agency and Natural Resources Wales expect this approach to be followed when managing risks from historic land contamination, alongside relevant national guidance.
The GOV.UK land contamination risk management guidance explains these stages. In practice, the conceptual site model developed from the site history and preliminary assessment can be tested through intrusive investigation where appropriate. Findings are assessed to determine whether unacceptable risks exist and whether further action is necessary.
Areas around former tanks, loading bays, chemical stores, drains, interceptors and historic spill locations may need particular attention. Removing plant or opening up hardstanding can reveal conditions that were previously concealed, although investigation may also be required before demolition or excavation begins.
Where work is needed, the objectives should be established before remediation starts. The evidence required for permit surrender, planning or a property transaction can differ, so the intended purpose of the assessment needs to be clear. Land remediation services address the treatment or management of identified contamination, with verification against the agreed objectives. A contaminated land assessment examines sources, pathways and receptors to establish whether contamination presents an unacceptable risk.
What the owner holds at handover
The end point of a decommissioning project should be a clear record of the condition of the site and the work carried out. That information may be needed for a sale, redevelopment, permit surrender or future investigation. It also identifies any structures, buried services or materials that remain in place.
The handover information will depend on the scope of the work, but commonly includes:
- Pre-works surveys, including asbestos information and the site history
- Tank and vessel cleaning records and atmosphere test results where applicable
- Waste consignment and transfer notes, together with relevant consignee returns
- Permit surrender documentation and the regulator’s decision where applicable
- Ground investigation findings and verification reports for any remediation undertaken
- As-left drawings of services, drainage, removed equipment and anything retained in place
The records should make it possible to distinguish between work that has been completed, areas that have been investigated and any outstanding matters. For a site being transferred to another owner, that distinction is important when assessing its condition and planning future use.